All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Produce bullion by means of a furnace |
SAQA US ID | UNIT STANDARD TITLE | |||
9587 | Produce bullion by means of a furnace | |||
ORIGINATOR | ||||
SGB Mining and Minerals | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Fabrication and Extraction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2007-10-30 | 2008-08-20 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2009-08-20 | 2012-08-20 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
256693 | Produce bullion by means of a furnace | Level 3 | NQF Level 03 | 5 |
PURPOSE OF THE UNIT STANDARD |
This unit standard will be useful to people who are responsible for producing bullion by means of a furnace.
People credited with this unit standard are able to: |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The credit calculation is based on the assumption that learners are already competent in terms of the following outcomes or areas of learning when starting to learn towards this unit standard:
|
UNIT STANDARD RANGE |
Specific range statements are provided in the body of the unit standard where they apply to particular specific outcomes or assessment criteria.
Note 1: Bullion includes all precious metals in lump form. Note 2: Furnaces must include the following: |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Demonstrate knowledge relating to bullion production. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The legal and specified requirements pertaining to a safe, healthy work environment when producing bullion and the consequences of not adhering to the above are explained. |
ASSESSMENT CRITERION 2 |
2. The importance of producing bullion in terms of achieving specified production requirements is explained. |
ASSESSMENT CRITERION 3 |
3. Hazards and associated risks, pertaining to bullion production, identified through specified risk assessment procedures, and the actions to be taken should they be encountered are explained. |
ASSESSMENT CRITERION 4 |
4. The principal components of the bullion production system are identified and explained. |
ASSESSMENT CRITERION RANGE |
Must include:
|
ASSESSMENT CRITERION 5 |
5. The specified actions to be taken, should sub-standard conditions and problems pertaining to the bullion production process be encountered, are explained. |
ASSESSMENT CRITERION 6 |
6. The specified security requirements pertaining to bullion production are explained. |
ASSESSMENT CRITERION 7 |
7. The specified elementary principles of the bullion production process are explained. |
ASSESSMENT CRITERION 8 |
8. The specified communication requirements pertaining to bullion production and the consequences of non-compliance are explained. |
ASSESSMENT CRITERION 9 |
9. The specified operating parameters and control methods and the consequences of not adhering to these are explained. |
ASSESSMENT CRITERION 10 |
10. The specified factors affecting the optimum performance of the smelting process are explained. |
SPECIFIC OUTCOME 2 |
Prepare to produce bullion. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Personal protective and safety equipment is verified, examined and used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
2. Tools and equipment are verified and examined in accordance with specified requirements. |
ASSESSMENT CRITERION 3 |
3. Workplace hazards and associated risks are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
4. The bullion production system is examined and substandard conditions are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
5. The charge is prepared and loaded in accordance with specified requirements. Specified lock-out procedures are adhered to. |
ASSESSMENT CRITERION 6 |
6. Safety and health precautions towards self and others are maintained in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
7. Specified security requirements pertaining to bullion production are met. |
SPECIFIC OUTCOME 3 |
Produce bullion. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Personal protective and safety equipment is used in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
2. The start-up of the bullion production system is in accordance with specified requirements. |
ASSESSMENT CRITERION 3 |
3. The bullion production process is monitored and controlled in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
4. Safe and optimum production is ensured through effective communication. |
ASSESSMENT CRITERION 5 |
5. Tools and equipment are used in accordance with specified requirements. |
ASSESSMENT CRITERION 6 |
6. Work related hazards and associated risks are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 7 |
7. Operational problems encountered are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 8 |
8. Specified security requirements pertaining to bullion production are met. |
ASSESSMENT CRITERION 9 |
9. The production process is consistent with environmental policy and other specified requirements. |
ASSESSMENT CRITERION 10 |
10. Safety and health precautions towards self and others are maintained in accordance with specified requirements. |
SPECIFIC OUTCOME 4 |
Complete the bullion production process. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The bullion production system is stopped in accordance with specified requirements. |
ASSESSMENT CRITERION 2 |
2. The products are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION RANGE |
ASSESSMENT CRITERION 3 |
3. Personal protective and safety equipment is dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 4 |
4. Tools and equipment are dealt with in accordance with specified requirements. |
ASSESSMENT CRITERION 5 |
5. Good housekeeping practices are maintained in accordance with specified requirements. |
ASSESSMENT CRITERION 6 |
6. Specified security requirements pertaining to bullion production are met. |
ASSESSMENT CRITERION 7 |
7. Specified reporting and data-recording requirements are met. |
ASSESSMENT CRITERION 8 |
8. Preparation for maintenance is in accordance with specified requirements. Specified lock-out procedures are adhered to. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Essential embedded knowledge will be assessed through assessment of the specific outcomes in terms of the stipulated assessment criteria. Without knowledge of the listed embedded knowledge, candidates are unlikely to achieve all the specific outcomes to the standards described in the assessment criteria. This means that for the most part, the possession or lack of the knowledge can be directly inferred from the quality of the candidate`s performance. Where direct assessment of knowledge is required, assessment criteria have been included in the body of the unit standard. |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems and make decisions using critical and creative thinking.
|
UNIT STANDARD CCFO WORKING |
Work effectively with others as a member of a team, group, organisation or community.
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage himself / herself and his / her activities responsibly and effectively.
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information.
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively, using visual, mathematical and / or language skills in the modes of oral and / or written presentations.
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically, thus showing responsibility towards the environment and health of others.
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems by recognising that problem-solving contexts do not exist in isolation.
|
UNIT STANDARD ASSESSOR CRITERIA |
Assessors should keep the following principles in mind when designing and conducting assessments against this unit standard:
|
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 256693, which is "Produce bullion by means of a furnace", Level 3, 5 credits.
Terminology: Specified requirements include legal and site-specific requirements and are contained in one or more of the following documents: Legal Site-Specific |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 49044 | National Certificate: Mineral Processing, Gold Extraction | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2008-08-20 | Was MQA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |