All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Inspect, assemble, remove, replace/install and adjust section insulator runners on 3-kV DC overhead track equipment under "live" conditions |
SAQA US ID | UNIT STANDARD TITLE | |||
119891 | Inspect, assemble, remove, replace/install and adjust section insulator runners on 3-kV DC overhead track equipment under "live" conditions | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Civil Engineering Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 14 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
The learner credited with this unit standard will be able to:
|
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
It is assumed that learners are competent in the following:
|
UNIT STANDARD RANGE |
> Personal protective equipment. > Train protection equipment. > Fire-Fighting equipment. > First-Aid equipment. > Equipment related to the inspection, assembling, removal, replacement/installation and adjustment of section insulator runners on OHTE related to isolated and earthed or live conditions. > Relevant sections of Act. 85. > Code of Practice No 29. > Train Working Rules. (TWR). > Company-specific electrical safety instructions. > Relevant sections of the Explosives Act. > Safety procedures related to isolated and earthed or live conditions. > Safe working methods related to isolated and earthed or live conditions. > Policies related to isolated and earthed or live conditions. > Installation procedures related to isolated and earthed or live conditions. > Maintenance procedures related to isolated and earthed or live conditions. > Dimensions of components. > Type of material from which components are manufactured. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Communicate with relevant role players and complete relevant documentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Job card is interpreted so that specified work can be executed correctly. |
ASSESSMENT CRITERION 2 |
Relevant documentation is completed correctly. |
ASSESSMENT CRITERION 3 |
Transport is arranged for personnel. |
ASSESSMENT CRITERION 4 |
Communication relating to the removal, replacement/installation of adjustment section insulator runners on 3-kV DC OHTE is carried out with all role players. |
SPECIFIC OUTCOME 2 |
Prepare to inspect, assemble, remove and replace section insulator runners. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Tools, equipment and are obtained and verified for correctness. |
ASSESSMENT CRITERION 2 |
Safe loading and off-loading of tools, material and equipment are ensured for correctness. |
ASSESSMENT CRITERION 3 |
The necessary safety precautions at the worksite are taken to prevent injury to personnel. |
ASSESSMENT CRITERION 4 |
Work permit is obtained correctly and timeously when work is performed under isolated and earthed conditions according to work-permit procedures. |
ASSESSMENT CRITERION 5 |
Protection is placed correctly according to TWR. |
SPECIFIC OUTCOME 3 |
Inspect, assemble, remove and replace section insulator runners. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Company-specific safe work procedures are followed correctly. |
ASSESSMENT CRITERION 2 |
Tools and equipment are placed and used safely and correctly. |
ASSESSMENT CRITERION 3 |
Lifting equipment is used correctly and safely according to statutory requirements. |
ASSESSMENT CRITERION 4 |
Section insulator runners are inspected for defects according to company and manufacturer's specifications. |
ASSESSMENT CRITERION 5 |
Section insulator runners are assembled according to manufacturer's specifications. |
ASSESSMENT CRITERION 6 |
Section insulator runners are removed and replaced in accordance with section insulator runners removal and replacement procedures. |
ASSESSMENT CRITERION 7 |
Section insulator runners are adjusted in accordance with section insulator runner adjustment procedures and manufacturer's specifications. |
SPECIFIC OUTCOME 4 |
Finalise the assembling, removal, replacement, installation and adjustment of section insulator and/or runners. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Quality checks are performed safely and correctly on section insulator and/or runners as per company-specific instructions and manufacturer's specifications. |
ASSESSMENT CRITERION 2 |
Tools, equipment and material are removed safely and correctly. |
ASSESSMENT CRITERION 3 |
Worksite is cleared according to company-specific instructions. |
ASSESSMENT CRITERION 4 |
Protection is removed correctly in accordance with TWR. |
ASSESSMENT CRITERION 5 |
Work permit is cancelled correctly and timeously according to work permit procedures when permit was issued. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Learners can understand and explain:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
Learner and societal development:
Learners can understand the importance of: |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Problem solving:
Learners can solve problems with regard to: |
UNIT STANDARD CCFO WORKING |
Teamwork:
Learners can work effectively in teams when: |
UNIT STANDARD CCFO ORGANISING |
Self-organisation and self-management:
A learner can organise and manage himself by: |
UNIT STANDARD CCFO COLLECTING |
Information evaluation:
Learners can interpret and evaluate the contents of: |
UNIT STANDARD CCFO COMMUNICATING |
Learners can communicate effectively with relevant role-players when:
|
UNIT STANDARD CCFO SCIENCE |
Learners can use science and technology by using:
|
UNIT STANDARD CCFO DEMONSTRATING |
Inter-relatedness of systems:
Learners can understand the role of overhead track equipment in the rail sector. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Values:
Supplementary information: Terminology: > Job card. > Job instruction. > 2-way radios. > Cellular phones. > Trunk radios. > Hand-held emergency telephones. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 49774 | Further Education and Training Certificate: Construction and Maintenance of Overhead Track Equipment | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | TETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Palesa Rail Academy |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |