SAQA All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.
SOUTH AFRICAN QUALIFICATIONS AUTHORITY 
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: 

Install control valves 
SAQA US ID UNIT STANDARD TITLE
119077  Install control valves 
ORIGINATOR
SGB Building Construction 
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY
-  
FIELD SUBFIELD
Field 12 - Physical Planning and Construction Building Construction 
ABET BAND UNIT STANDARD TYPE PRE-2009 NQF LEVEL NQF LEVEL CREDITS
Undefined  Regular  Level 2  NQF Level 02 
REGISTRATION STATUS REGISTRATION START DATE REGISTRATION END DATE SAQA DECISION NUMBER
Passed the End Date -
Status was "Reregistered" 
2018-07-01  2023-06-30  SAQA 06120/18 
LAST DATE FOR ENROLMENT LAST DATE FOR ACHIEVEMENT
2024-06-30   2027-06-30  

In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise.  

This unit standard does not replace any other unit standard and is not replaced by any other unit standard. 

PURPOSE OF THE UNIT STANDARD 
Purpose of the unit standard:
The qualifying learner is capable of:
This unit standard will be useful to people who work in the civil construction industry.
People credited with this unit standard are able to demonstrate knowledge of pipelaying activities and are able to prepare and install control valves.
Demonstrating knowledge of civil construction plant, equipment, and activities

The contribution to the national skills development strategy is the key developmental interface between learners and new competencies to be achieved.

Learners who master the applied competence described in this unit standard will contribute to the development of a professional community of civil engineering construction concreting practitioners who are able to competently use science and technology when conducting routine site tests to fresh and hardened concrete.

The contribution to socio-economic transformation is that learners will be able to undergo rpl-assessment and thereby receive recognition for previous learning and experience. This in turn will enhance the employability and career prospects of learners employed in this sector. 

LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING 
NQF 1 Numeracy and NQF 1 Literacy
The following knowledge, skills attitude and/or equivalent:
It is assumed that people starting to learn towards this unit standard are already able to:
  • Use and maintain basic hand tools;
  • Use relevant equipment.
  • Read and interpret drawings and specifications
  • Apply relevant health and safety standards
  • Procure materials
  • Install various types of pipes 

  • UNIT STANDARD RANGE 
    Air Valves, Gate valves, Sluice Valves, Stop Valves, Scour Valves, Hydrants

    Testing should include visual alignment, and water and air pressure tests. 

    Specific Outcomes and Assessment Criteria: 

    SPECIFIC OUTCOME 1 
    Control valve installation resources are identified and procured. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    Prescribed resources are identified and Procured. 

    ASSESSMENT CRITERION 2 
    All tools, equipment and personal protective equipment required for the task are identified and ensured to be functional, and are ready for use at work area. 

    ASSESSMENT CRITERION 3 
    Resources are handled and stored in accordance with code of practice 

    SPECIFIC OUTCOME 2 
    Prepare the work area before installation of control valves. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    Work area is checked for hazards. All hazards are identified and corrective action is taken in line with worksite housekeeping procedures. 

    ASSESSMENT CRITERION 2 
    All legislated safety precautions are adhered to in terms of work carried out below ground level. 

    ASSESSMENT CRITERION 3 
    The work area is neat, free of obstructions, water, and loose material, within specification tolerances, and adheres to all design specifications in accordance with given instructions and drawings. 

    ASSESSMENT CRITERION 4 
    The area is set out to line and level to receive the control valves in accordance with contract requirements. 

    SPECIFIC OUTCOME 3 
    Install control valves pipes. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    Work is carried out in accordance with work place safety requirements. 

    ASSESSMENT CRITERION 2 
    Tools and equipment are used in accordance with their designed purpose. 

    ASSESSMENT CRITERION 3 
    Personal protective equipment is used as required in accordance with the OHS Act. 

    ASSESSMENT CRITERION 4 
    Control valves are laid neat and true to line and level within specification tolerances, and adhere to all design specifications in accordance with given instructions. 

    ASSESSMENT CRITERION 5 
    The control valves are installed within industry acceptable time frames. 

    SPECIFIC OUTCOME 4 
    Finish the installation of control valves. 

    ASSESSMENT CRITERIA
     

    ASSESSMENT CRITERION 1 
    The control valves is cleaned and disinfected according to contract requirements. 

    ASSESSMENT CRITERION 2 
    The control valves are tested in accordance with the specifications. 

    ASSESSMENT CRITERION 3 
    The installation of control valves is finished-off to contract requirements. 


    UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS 
  • Anyone assessing a learner or moderating the assessment of a learner against this unit standard must be registered as an assessor with the CETA - ETQA for this unit standard or a similar unit standard at a higher NQF Level
  • Any institution offering learning that will enable the achievement of this unit standard must be accredited as a provider with the CETA-ETQA
  • CETA-ETQA or other ETQA's who have a Memorandum of Understanding in place with CETA-ETQA would be responsible for moderation of learner achievements of learners who meet the requirements of this qualification 

  • UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE 
  • Health and safety requirements and worksite housekeeping procedures.
  • Tools, test equipment and personal protective equipment and how they are to be used.
  • Purpose and procedure of disinfection.
  • Prescribed control valve installation resources
  • The importance of complying with policies, procedures and legislation.
  • Resource procurement procedures.
  • Work policies and procedures. 

  • UNIT STANDARD DEVELOPMENTAL OUTCOME 
    N/A 

    UNIT STANDARD LINKAGES 
    N/A 


    Critical Cross-field Outcomes (CCFO): 

    UNIT STANDARD CCFO IDENTIFYING 
    Identify and solve problems

    Specific outcome:
  • Finish the installation of control valves

    Assessment criteria:
  • The control valves are tested in accordance with the specifications. 

  • UNIT STANDARD CCFO WORKING 
    Work effectively with others

    Specific outcome:
  • Install control valves pipes.

    Assessment criteria:
  • The control valves are installedWithin industry acceptable timeFrames. 

  • UNIT STANDARD CCFO ORGANISING 
    Employ self management

    Specific outcome:
  • Finish the installation of control valves

    Assessment criteria:
  • The installation of control valves is finished-off to contract requirements. 

  • UNIT STANDARD CCFO COLLECTING 
    Manage information

    Specific outcome:
  • Install control valves pipes.

    Assessment criteria:
  • Control valves are laid neat and true to line and level within specification tolerances, and adhere to all design specifications in accordance with given instructions. 

  • UNIT STANDARD CCFO COMMUNICATING 
    Communicate effectively

    Specific outcome:
  • Prepare the work area before installation of control valves

    Assessment criteria:
  • The work area is neat, free of obstructions, water, and loose material, within specification tolerances, and adheres to all design specifications in accordance with given instructions and drawings. 

  • UNIT STANDARD CCFO SCIENCE 
    Demonstrate scientific and technological competence

    Specific outcome:
  • Prepare the work area before installation of control valves

    Assessment criteria:
  • The area is set out to line and level to receive the control valves in accordance with contract requirements 

  • UNIT STANDARD CCFO DEMONSTRATING 
    Understand contextual world-systems

    Specific outcome:
  • Prepare the work area before installation of control valves

    Assessment criteria:
  • Work area is checked for hazards. All hazards are identified and corrective action is taken in line with worksite housekeeping procedures. 

  • UNIT STANDARD ASSESSOR CRITERIA 
    N/A 

    REREGISTRATION HISTORY 
    As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. 

    UNIT STANDARD NOTES 
    Supplementary information:
    Acts, regulations, specifications and standards applicable to this unit standard:
    (i) Occupational health and safety act 1993.
    (ii) Gnr 1010 of 18 july 2003: construction regulations 2003.
    (iii) National environmental management act (no.107 of 1998)
    (iv) South african bureau of standards.
    (v) National building regulations. 

    QUALIFICATIONS UTILISING THIS UNIT STANDARD: 
      ID QUALIFICATION TITLE PRE-2009 NQF LEVEL NQF LEVEL STATUS END DATE PRIMARY OR DELEGATED QA FUNCTIONARY
    Elective  49411   General Education and Training Certificate: Construction  Level 1  NQF Level 01  Passed the End Date -
    Status was "Reregistered" 
    2023-06-30  CETA 
    Elective  49410   National Certificate: Construction  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2023-06-30  CETA 
    Elective  96402   National Certificate: Hot Water System Installation  Level 2  NQF Level 02  Passed the End Date -
    Status was "Reregistered" 
    2023-06-30  As per Learning Programmes recorded against this Qual 


    PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: 
    This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here.
     
    1. ESKOM KOEBERG - EE - GENERATION & TRADE TEST CENTRE 
    2. GG SQUARED PROJECTS 
    3. KHOSITHI TRAINING 
    4. MARULENG TRAINING ACADEMY 
    5. NTLEMO PROJECTS 



    All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source.