All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Fault find an air-conditioning, refrigeration or ventilation plant stoppage or failure |
SAQA US ID | UNIT STANDARD TITLE | |||
116697 | Fault find an air-conditioning, refrigeration or ventilation plant stoppage or failure | |||
ORIGINATOR | ||||
SGB Air-conditioning Refrigeration and Ventilation | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 3 | NQF Level 03 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
9330 | Fault-find a refrigeration plant stoppage or failure | Level 3 | NQF Level 03 | 5 |
PURPOSE OF THE UNIT STANDARD |
Determine the possible reason(s) why an air-conditioning, refrigeration or ventilation plant has stopped operating re-start the plant and/or report on the cause(s) of the failure or stoppage. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
UNIT STANDARD RANGE |
Plant stoppage due to mechanical or electrical faults, or due to controls being set wrongly.
Electrical faults: Mains power failure, circuit breakers tripped, overloads tripped, fuses blown, contactors or relays failed, loose or burnt wires, faulty starting accessories, motor failures, faulty transformer, incorrect time clock or time relay setting, loose connections. Mechanical faults: Loose or broken belts or couplings, loose or broken fan blades, broken pipes, dirty or iced up coils. Control instruments: Pressure switches, oil pressure switch, Thermostats, humidistats, time clocks and timers. Switching and protective devices: Relays, contactors, isolators, fuses, circuit breakers and overloads. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Prepare for the task of faultfinding a plant. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Appropriate electrical and mechanical testing tools are obtained. |
ASSESSMENT CRITERION 2 |
The operating and maintenance instructions for the plant are obtained and interpreted. |
ASSESSMENT CRITERION 3 |
The exact location of the plant is established. |
ASSESSMENT CRITERION 4 |
Available service records for the plant are inspected. |
ASSESSMENT CRITERION 5 |
Possible reasons for plant stoppage are discussed with the user/operator. |
ASSESSMENT CRITERION 6 |
Possible faults causing the plant failure are explained. |
SPECIFIC OUTCOME 2 |
Establish possible electrical faults causing the plant stoppage. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Possible electrical faults are listed and explained. |
ASSESSMENT CRITERION 2 |
All possible causes for electrical faults are investigated and diagnosed. |
ASSESSMENT CRITERION 3 |
The consequences of faulty selection of switching or protective devices are listed and explained. |
ASSESSMENT CRITERION 4 |
All electrical testing instruments are used correctly. |
ASSESSMENT CRITERION 5 |
The appropriate corrective action is taken. |
ASSESSMENT CRITERION 6 |
Consequences of wrong power supply and/or faulty setting of overloads are explained. |
ASSESSMENT CRITERION 7 |
Faultfinding is done in a methodical manner. |
SPECIFIC OUTCOME 3 |
Establish possible control faults causing the plant stoppage. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Possible faulty control settings are listed and explained. |
ASSESSMENT CRITERION 2 |
The settings on all control instruments are checked and compared with stipulated or normally acceptable settings required for correct and safe operation. |
ASSESSMENT CRITERION 3 |
Control settings are adjusted according to specified parameters or as required for correct and safe operation. |
ASSESSMENT CRITERION 4 |
The defrost system is checked for correct operation. |
ASSESSMENT CRITERION 5 |
The appropriate corrective action is taken. |
ASSESSMENT CRITERION 6 |
Consequences of faulty settings on controls are listed and explained. |
ASSESSMENT CRITERION 7 |
Faultfinding is done in a methodical manner. |
SPECIFIC OUTCOME 4 |
Establish possible mechanical faults causing the plant stoppage. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Possible mechanical faults are listed and explained. |
ASSESSMENT CRITERION 2 |
Consequences of mechanical faults are listed and explained. |
ASSESSMENT CRITERION 3 |
Possible mechanical faults are investigated. |
ASSESSMENT CRITERION 4 |
Appropriate corrective action is taken. |
SPECIFIC OUTCOME 5 |
Report back to supervisor or client. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
A written or verbal report about the plant stoppage is made. |
ASSESSMENT CRITERION 2 |
Faults are correctly reported. |
ASSESSMENT CRITERION 3 |
Further action required is explained. |
ASSESSMENT CRITERION 4 |
Possible consequences of plant stoppage are explained. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
Any person wishing to be assessed against this unit standard may apply to an assessment agency, assessor or provider institution accredited by the relevant ETQA, who may appoint a moderator to be present at the assessment.
The assessor must have knowledge and experience in air-conditioning, refrigeration or ventilation. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Possible causes and events leading up to plant stoppage or failure and method(s) of faultfinding. |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems
|
UNIT STANDARD CCFO ORGANISING |
Organize and manage myself and my activities
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyze, organize and critically evaluate information
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
This unit standard is replacing unit standard 9330 - 'Fault find an air-conditioning, refrigeration or ventilation plant stoppage or failure' - Level 3.
Supplementary information This unit standard deals with finding the reasons or causes for a plant having stopped due to electrical, mechanical reasons or due to controls having been set wrongly. The learner is expected to restore plant operation and/or report back. |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 65489 | National Certificate: Air-Conditioning, Refrigeration and Ventilation | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Core | 48963 | National Certificate: Air-Conditioning, Refrigeration and Ventilation | Level 3 | NQF Level 03 | Passed the End Date - Status was "Reregistered" |
2009-03-12 | Was MERSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |