All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Shutdown a gas turbine power generator unit from a control room for maintenance outage |
SAQA US ID | UNIT STANDARD TITLE | |||
116454 | Shutdown a gas turbine power generator unit from a control room for maintenance outage | |||
ORIGINATOR | ||||
SGB Power Plant Operations | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 4 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This Unit Standard is for a person who performs a Shutdown of a Gas Turbine Power Generating Unit from a Control Room.
A person credited with this Unit Standard is able to: 1. Deload the Plant 2. Shutdown running plant. 3. Isolate plant for maintenance purposes |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
1. Communication ability sufficient to listen, question, observe, describe accurately and align with the senders needs.
2. The ability to recognise, analyse problems, evaluate options and decide on the most appropriate action. 3. An understanding of the energy conversion process. 4. A technical understanding at N3 level of mathematics, engineering science, power plant theory electrical trade theory or electro technology. 5. A basic understanding of production process chemicals, their use and dangers. 6. Safety equipment use. 7. General safety and regulatory requirements |
UNIT STANDARD RANGE |
N/A |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Shutdown gas turbine generating unit. |
OUTCOME RANGE |
Auto and Manual shutdown in Generating Mode from MCR to Standstill.
Manual shutdown in Synchronous Compensation Mode from MCR to Standstill |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Instruction to deload is confirmed according to organisational requirements. |
ASSESSMENT CRITERION 2 |
Situational Analysis conducted on running status of the Unit. |
ASSESSMENT CRITERION 3 |
Deloading Selection carried out based on Situational Analysis. |
ASSESSMENT CRITERION 4 |
Plant Deloaded and Shutdown according to Operating procedures. |
ASSESSMENT CRITERION 5 |
Out of normal plant conditions identified and reacted upon according to operating requirements |
ASSESSMENT CRITERION 6 |
Operating events and Plant status communicated according to organisational requirements. |
ASSESSMENT CRITERION 7 |
Safety and Regulatory Requirements adhered to |
SPECIFIC OUTCOME 2 |
Isolate shutdown plant. |
OUTCOME RANGE |
Mechanical and Electrical Isolations for maintenance outage. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Instruction to isolate plant confirmed according to Organisational requirements |
ASSESSMENT CRITERION 2 |
Isolations carried out according to operating procedures. |
ASSESSMENT CRITERION 3 |
Isolations performed within planned scheduled time frames. |
ASSESSMENT CRITERION 4 |
Operating events and plant status communicated according to organisational requirements. |
ASSESSMENT CRITERION 5 |
Out of normal plant conditions identified and reacted upon according to operating requirements |
ASSESSMENT CRITERION 6 |
Safety and Regulatory Requirements adhered to. |
SPECIFIC OUTCOME 3 |
Demonstrate knowledge and understanding to shutdown the gas turbine unit. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Knowledge and understanding with respect to the following are demonstrated:
|
ASSESSMENT CRITERION 2 |
Knowledge and understanding with regard to the following are demonstrated:
|
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any institution offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. The assessment of qualifying learners against this standard should meet the requirements of established principles. Practical assessment activities will be used, which are appropriate to the contents in which qualifying learners are working. These activities will include an appropriate combination of self and peer assessment, practical and oral assessments, observations etc. The assessment should ensure that all the specific outcomes, critical cross-field outcomes and essential embedded knowledge be assessed. The specific outcomes must be assessed in its own right, through oral and practical evidence. It cannot be assessed by observation only. The specific outcomes and essential knowledge must be assessed in relation to each other. If a qualifying learner is able to explain the essential embedded knowledge, but is unable to perform the specific outcomes, then they should not be assessed as competent. Similarly, if a learner is able to perform specific outcomes, but is unable to explain or justify their performance in terms of the essential embedded knowledge, they should not be assessed as competent. Evidence of the specified critical cross-field outcomes should be found, both in performance and in the essential embedded knowledge. Performance of specific outcomes must actively affirm target groups of qualifying learners, not unfairly discriminate against them. Qualifying learners should be able to justify their performance in terms of these values. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
N/A |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems
Assessment Criteria reference Knowledge and understanding with respect to the following are demonstrated: 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO WORKING |
Work effectively with others
Assessment Criteria reference Knowledge and understanding with respect to the following are demonstrated: 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage myself and my activities
Assessment Criteria reference 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information
Assessment Criteria reference 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively
Assessment Criteria reference 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically
Assessment Criteria reference 1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as set of related systems
1. Communication Structures, Procedures and requirements 2. Operating procedures w.r.t. plant 3. Standard Plant isolations for maintenance purposes. 4. Regulatory requirements w.r.t. mechanical and electrical plant Shutdown and Isolations. 5. Operating Control and Protection philosophies pertaining to plant shutdown. 6. Technical specifications with respect to plant and system. 1. Anticipation of the direct impact of decisions and actions on plant in the direct working environment. 2. Key conversion process concepts. 3. The theory of application on mechanical and electrical plant components and their interrelation to the plant. 4. Binary and analogue control and instrumentation systems, their integration and schematic diagrams as well as the interface between the different control systems. 5. Process plant operation. 6. Plant incidents and trends related to shutdown of gas turbine. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
The following Reference to Assessment Tools to be made throughout this Unit Standard:
1. Auto shutdown in Generating mode from MCR to Standstill. 2. Manual shutdown in Generating mode from MCR to Standstill. 3. Manual shutdown in Synchronous Compensation Mode from MCR to Standstill. 4. Isolate plant mechanically for maintenance outage. 5. Isolate plant electrically for maintenance outage. 6. Demonstrate knowledge to shutdown Gas Turbine Unit |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 48978 | Further Education and Training Certificate: Electrical Network Control | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | EWSETA |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | Kelvin Power (Pty) Ltd |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |