All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Test and inspect a three phase industrial/commercial installation |
SAQA US ID | UNIT STANDARD TITLE | |||
113894 | Test and inspect a three phase industrial/commercial installation | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 10 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2007-04-03 | 2009-02-18 | SAQA 0160/05 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2010-02-18 | 2013-02-18 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard replaces: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
13822 | Testing and inspection of a commercial/industrial installation | Level 4 | NQF Level 04 | 9 |
This unit standard is replaced by: |
US ID | Unit Standard Title | Pre-2009 NQF Level | NQF Level | Credits | Replacement Status |
259197 | Test and inspect a three phase industrial/commercial installation | Level 4 | NQF Level 04 | 10 |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will be capable of: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. This unit standard is a pre requisite for registration as an accredited person and does not give the learner the legal right to issue a Certificate of Compliance. The registering authority will do registration as an accredited person. This unit standard may not cover the Explosion Industry. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Plan the electrical installation tests to be done. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Job instructions are interpreted and a sequence of operations is determined according to the installation environment and the required task. |
ASSESSMENT CRITERION 2 |
2. Appropriate tools, equipment and instruments are identified and selected to meet the requirements of the task according to statutory and environmental requirements. |
ASSESSMENT CRITERION 3 |
3. The correct documentation necessary to complete the task is obtained as per data management requirements. |
ASSESSMENT CRITERION 4 |
4. The safety rules and regulations regarding the task is understood according to statutory requirements and safe work procedures. |
ASSESSMENT CRITERION 5 |
5. Environmental hazards and safety risks are identified according to environmental standards and safety risk analyses. |
SPECIFIC OUTCOME 2 |
Test the electrical installation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Permission is obtained to carry out task as per local authorisation procedures. |
ASSESSMENT CRITERION 2 |
2. Installation is tested according to the statutory requirements from the wiring code. |
ASSESSMENT CRITERION 3 |
3. Appropriate documentation is completed as per data management system requirements. |
ASSESSMENT CRITERION 4 |
4. Appropriate test instruments used competently to obtain meaningful readings. |
ASSESSMENT CRITERION 5 |
5. The measurements obtained from the test is understood and demonstrated in context with the wiring code specifications. |
ASSESSMENT CRITERION 6 |
6. All safety precautions are observed and demonstrated during the test as per safe work procedures. |
SPECIFIC OUTCOME 3 |
Inspect the electrical installation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The Installation is inspected for compliance according to statutory and environmental requirements. |
ASSESSMENT CRITERION 2 |
Appropriate documentation for the type of installation is completed as per data management system requirements. |
ASSESSMENT CRITERION 3 |
Any non-compliant components within the installation is identified and understood in relation with the wiring code requirements. |
ASSESSMENT CRITERION 4 |
All safety requirements are observed during the inspection as per industry standards. |
SPECIFIC OUTCOME 4 |
Complete the required test and inspection documentation. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. All personnel, tools, instruments and access equipment have been removed from the installation as per work site-and safe work procedures. |
ASSESSMENT CRITERION 2 |
2. The work area is restored to its original condition and is safe for use as per industry requirements. |
ASSESSMENT CRITERION 3 |
3. The results of the inspection and test is communicated and processed as per data management system requirements. |
ASSESSMENT CRITERION 4 |
4. A report and where necessary, a defect list is compiled on the inspection and test as per industry requirements. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any provider offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify defects and solve problems. |
UNIT STANDARD CCFO WORKING |
Work effectively with others during the testing and inspection of an installation. |
UNIT STANDARD CCFO ORGANISING |
Organise and manage oneself during the identification and selection of electrical equipment for the installation. |
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information during the inspection and testing of the installation. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate and report defects. |
UNIT STANDARD CCFO DEMONSTRATING |
Interpretation of statutory requirements. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
UNIT STANDARD NOTES |
This unit standard has been replaced by unit standard 259197, which is "Test and inspect a three phase industrial/commercial installation", Level 4, 10 credits.
This unit standard replaces unit standard 13822 'Testing and inspection of a commercial / industrial installation'. Supplementary Information: Specified Requirements Specified requirements include legal and legislative specific requirements and are contained in one or more of the following documents: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 48474 | National Certificate: Electrical Engineering | Level 4 | Level TBA: Pre-2009 was L4 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |