All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Design a wind/solar hybrid system |
SAQA US ID | UNIT STANDARD TITLE | |||
113890 | Design a wind/solar hybrid system | |||
ORIGINATOR | ||||
SGB Electrical Engineering & Construction | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 12 - Physical Planning and Construction | Electrical Infrastructure Construction | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 4 | NQF Level 04 | 5 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
This unit standard is for persons in the Electrical Engineering; Generation; Distribution; Transmission, Construction and Renewable Energy Sector.
A person credited with this unit standard will be able to: This unit standard will contribute to the full development of the learner within the electrical engineering and construction environment by providing recognition, further mobility and transportability within the field of Physical Planning and Construction. The skills, knowledge and understanding demonstrated within this unit standard are essential for social and economic transformation and upliftment within the electrical engineering and construction environment. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
The following knowledge, skills attitude and/or equivalent:
|
UNIT STANDARD RANGE |
a. Contactors. b. Protection (fuses, circuit breakers, earth leakage and over load relays). c. Controls (temperature, pressure, level, and time switches). d. Loads (resistive and inductive). e. Inverters (Maximum 250 volt). |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Wind and solar resource is assessed to determine viability. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Data manuals are correctly identified according to geographical location. |
ASSESSMENT CRITERION 2 |
2. Data is correctly analysed for application. |
ASSESSMENT CRITERION 3 |
3. Adjustments for height (wind data) are correctly carried out. |
ASSESSMENT CRITERION 4 |
4. Data is correctly applied to determine the average available energy. |
ASSESSMENT CRITERION RANGE |
Written data, records, electronic data. |
SPECIFIC OUTCOME 2 |
Assessment of wind and solar resource data for wind/solar hybrid feasibility. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Daily graphical representations of wind and solar data is compared for compatibility and explained. |
ASSESSMENT CRITERION 2 |
2. Annual graphical representations of wind and solar data is compared for compatibility and explained. |
ASSESSMENT CRITERION 3 |
3. Supplementary features between wind and solar data is identified and explained. |
SPECIFIC OUTCOME 3 |
Development and assessment of a load profile. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. A daily load profile is developed. |
ASSESSMENT CRITERION 2 |
2. An annual load profile is developed. |
ASSESSMENT CRITERION 3 |
3. The load profiles are assessed and explained. |
SPECIFIC OUTCOME 4 |
Assessment of wind and solar resource data for optimised load compatibility. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. The load profiles are assessed against the relevant wind and solar data and explained. |
ASSESSMENT CRITERION 2 |
2. Wind and solar data profiles are assessed and their compatibility with each other and the load explained in terms of a hybrid system. |
SPECIFIC OUTCOME 5 |
Calculation of photovoltaic array and wind turbine rating. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
1. Best case scenario for wind/solar hybrid is calculated and explained as per the available resource data, load data and manufacturers specifications. |
ASSESSMENT CRITERION 2 |
2. Cost effectiveness of results is tested and explained. |
ASSESSMENT CRITERION 3 |
3. The calculations in 1 and 2 is repeated in an iterative process to obtain the best results. |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
1. Anyone assessing a learner against this unit standard must be registered as an assessor with the relevant ETQA.
2. Any provider offering learning that will enable achievement of this unit standard must be accredited as a provider through the relevant ETQA. 3. Moderation of assessment will be overseen by the relevant ETQA according to the moderation guidelines in the relevant qualification and the agreed ETQA procedures. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
Knowledge that will help me understand and that I will be able to explain:
|
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems during the application and maintaining of electrical safety. |
UNIT STANDARD CCFO WORKING |
Work effectively with others while applying and maintaining electrical safety. |
UNIT STANDARD CCFO ORGANISING |
Organize and manage oneself during the design of a hybrid energy system. |
UNIT STANDARD CCFO COMMUNICATING |
Communicate through reporting. |
UNIT STANDARD CCFO SCIENCE |
Use science and technology in environmental and personal safety. |
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems. |
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
Supplementary Information
Specified Requirements: Specified requirements include legal and legislative specific requirements and are contained in one or more of the following documents: A glossary of terms about the terminology of: |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Elective | 72052 | Further Education and Training Certificate: Electrical Engineering | Level 4 | NQF Level 04 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | As per Learning Programmes recorded against this Qual |
Elective | 48474 | National Certificate: Electrical Engineering | Level 4 | Level TBA: Pre-2009 was L4 | Passed the End Date - Status was "Reregistered" |
2009-02-18 | Was EWSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
1. | ESKOM GENERATION - PALMIET PUMP STORAGE GRABOUW |
2. | KP ACADEMY (PTY) LTD |
3. | POWER SYSTEMS TRAINING, CAPE TOWN |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |