All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |
SOUTH AFRICAN QUALIFICATIONS AUTHORITY |
REGISTERED UNIT STANDARD THAT HAS PASSED THE END DATE: |
Prepare mould for polymer composite fabrication |
SAQA US ID | UNIT STANDARD TITLE | |||
110279 | Prepare mould for polymer composite fabrication | |||
ORIGINATOR | ||||
SGB Plastics Manufacturing | ||||
PRIMARY OR DELEGATED QUALITY ASSURANCE FUNCTIONARY | ||||
- | ||||
FIELD | SUBFIELD | |||
Field 06 - Manufacturing, Engineering and Technology | Manufacturing and Assembly | |||
ABET BAND | UNIT STANDARD TYPE | PRE-2009 NQF LEVEL | NQF LEVEL | CREDITS |
Undefined | Regular | Level 2 | NQF Level 02 | 8 |
REGISTRATION STATUS | REGISTRATION START DATE | REGISTRATION END DATE | SAQA DECISION NUMBER | |
Passed the End Date - Status was "Reregistered" |
2018-07-01 | 2023-06-30 | SAQA 06120/18 | |
LAST DATE FOR ENROLMENT | LAST DATE FOR ACHIEVEMENT | |||
2024-06-30 | 2027-06-30 |
In all of the tables in this document, both the pre-2009 NQF Level and the NQF Level is shown. In the text (purpose statements, qualification rules, etc), any references to NQF Levels are to the pre-2009 levels unless specifically stated otherwise. |
This unit standard does not replace any other unit standard and is not replaced by any other unit standard. |
PURPOSE OF THE UNIT STANDARD |
People in the field of polymer composite fabrication require the skills, values and knowledge reflected in this unit standard. The fabrication of composites requires the combination of two or more different materials to form a product. What makes composites unique is that a composite material is formed at the same time as the structure itself is being fabricated. This means that the person who is making the structure is creating the properties of the resultant composite material, and so the manufacturing processes that are used have an unusually critical part to play in determining the performance of the resultant structure. Composites are not like metals, where a sheet might be made in one factory and shaped into a car roof in another. With composites it all happens at once. The products are often subjected to considerable or sometimes extreme stress when in operation and the manufacturing process needs to be consistent and accurate.
Qualifying learners are able to: The learning outcomes in this unit standard contribute to the exit level outcomes required for the National Certificate in Polymer Composite Fabrication (NQF Level 2) and related qualifications. |
LEARNING ASSUMED TO BE IN PLACE AND RECOGNITION OF PRIOR LEARNING |
This unit standard has been designed as part of a progression and reflects the first level of composite fabrication skill. It is one of a series of unit standards for activities at and above this level. The credits assigned to it are based on the assumption that I am learning what is needed for this unit standard as part of my learning for a range of related unit standards. If I have experience in these related activities but do not have credits for them, I can obtain credits by being assessed through a process that recognises prior learning. If I do not have such experience of related activities, then my learning time will be increased. I can choose to be assessed and obtain credits against those other unit standards as I make progress towards the outcomes of this unit standard. |
UNIT STANDARD RANGE |
The ranges as indicated under the specific outcomes determine the scope and level of this unit standard.
All work is performed under supervision. |
Specific Outcomes and Assessment Criteria: |
SPECIFIC OUTCOME 1 |
Locate, identify, transport and mount the correct mould for the required product. |
OUTCOME RANGE |
Mould refers to an open mould but excludes spray processes
Mount means position in an appropriate place for preparation process |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Refer to consolidated assessment criteria in specific outcome 4. |
SPECIFIC OUTCOME 2 |
Identify, locate and correct common defects and deformities on mould. |
OUTCOME RANGE |
Defects on visual/touch inspection include but are not limited to:
|
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Refer to consolidated assessment criteria in specific outcome 4. |
SPECIFIC OUTCOME 3 |
Clean and assemble mould, and apply release agent. |
OUTCOME RANGE |
Release agents include waxes, semi-permanent coatings, PVA, silicone compounds, release films, flange waxes and sealers
Cleaning agents: solvents, detergents, abrasives, rags, compressed air |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
Refer to consolidated assessment criteria in specific outcome 4. |
SPECIFIC OUTCOME 4 |
Record and report all identified problems and faults. |
ASSESSMENT CRITERIA |
ASSESSMENT CRITERION 1 |
The assessment criteria have been formulated in this way to provide guidance to assessors:
Results achieved: Indicators: Understanding confirmed: Respond to "what if" and "why" questions covering: |
UNIT STANDARD ACCREDITATION AND MODERATION OPTIONS |
My assessment will be governed by the policies and guidelines of the MERSETA Education and Training Quality Assurance Body, which has jurisdiction over this field of learning. My assessor will be accredited and have a technical qualification in this learning area.
I can be assessed in the language of my choice although if I have to report incidents or conditions to someone else, I will be assessed on my ability to report in the language commonly used in my working environment. I will be assessed in the workplace but I can submit documents, projects, test results and assignments that were not produced in the workplace. I can be assessed against this unit standard to obtain credits or as part of an integrated assessment for a qualification. |
UNIT STANDARD ESSENTIAL EMBEDDED KNOWLEDGE |
1. Names & functions of:
2. Purpose of: 3. Attributes, properties characteristics 4. Sensory cues 5. Processes, events, causes and effects, implications: 6. Procedures and techniques: 7. Theory: rules, principles, laws: 8. Relationships, systems: |
UNIT STANDARD DEVELOPMENTAL OUTCOME |
N/A |
UNIT STANDARD LINKAGES |
N/A |
Critical Cross-field Outcomes (CCFO): |
UNIT STANDARD CCFO IDENTIFYING |
Identify and solve problems
|
UNIT STANDARD CCFO ORGANISING |
Organise and manage myself and my activities
|
UNIT STANDARD CCFO COLLECTING |
Collect, analyse, organise and critically evaluate information
|
UNIT STANDARD CCFO COMMUNICATING |
Communicate effectively
|
UNIT STANDARD CCFO SCIENCE |
Use science and technology effectively and critically
|
UNIT STANDARD CCFO DEMONSTRATING |
Demonstrate an understanding of the world as a set of related systems
|
UNIT STANDARD ASSESSOR CRITERIA |
N/A |
REREGISTRATION HISTORY |
As per the SAQA Board decision/s at that time, this unit standard was Reregistered in 2012; 2015. |
UNIT STANDARD NOTES |
N/A |
QUALIFICATIONS UTILISING THIS UNIT STANDARD: |
ID | QUALIFICATION TITLE | PRE-2009 NQF LEVEL | NQF LEVEL | STATUS | END DATE | PRIMARY OR DELEGATED QA FUNCTIONARY | |
Core | 36154 | National Certificate: Polymer Composite Fabrication | Level 2 | NQF Level 02 | Passed the End Date - Status was "Reregistered" |
2023-06-30 | MERSETA |
Elective | 50542 | National Certificate: Small Craft Construction | Level 2 | NQF Level 02 | Passed the End Date - Status was "Registered" |
2009-08-31 | Was MERSETA until Last Date for Achievement |
PROVIDERS CURRENTLY ACCREDITED TO OFFER THIS UNIT STANDARD: |
This information shows the current accreditations (i.e. those not past their accreditation end dates), and is the most complete record available to SAQA as of today. Some Primary or Delegated Quality Assurance Functionaries have a lag in their recording systems for provider accreditation, in turn leading to a lag in notifying SAQA of all the providers that they have accredited to offer qualifications and unit standards, as well as any extensions to accreditation end dates. The relevant Primary or Delegated Quality Assurance Functionary should be notified if a record appears to be missing from here. |
NONE |
All qualifications and part qualifications registered on the National Qualifications Framework are public property. Thus the only payment that can be made for them is for service and reproduction. It is illegal to sell this material for profit. If the material is reproduced or quoted, the South African Qualifications Authority (SAQA) should be acknowledged as the source. |